Posts 11-20

2006

Priory were awarded the mechanical services package on a high quality residential project in one of the most prestigious roads in Kensington. The principal contractor on this project was Walter Lilly prestigious in their own right as one of London's leading contractors. We are proud to have been awarded high quality residential projects from them [...]

2021-01-06T14:53:59+00:00January 6th, 2021|

2013

Priory were awarded their first contract with top Contractor Sizebreed Construction (now Size Group London). This was the first of many times working for Size Group over the years and in this high quality residential sector of which Size Group specialise in. This project in Belgravia was a full refurbishment and Priory were awarded the [...]

2021-01-06T14:58:48+00:00January 6th, 2021|

2003

Priory secured their first high end residential project working for Stanhope Gate Architecture. The project in Mayfair, London was a refurbishment with Priory carrying out the mechanical and public health packages which included works to the gas and LTHW systems, air conditioning, BMS controls and high end sanitaryware fit out.

2021-01-08T15:44:06+00:00January 6th, 2021|

2006

Priory worked with Galliford Try and the developer to secure the building for purpose made new offices for the UK Immigration Services located opposite the channel tunnel entrance in Folkstone. This design and build contract included achieving an 'excellent' BREEAM rating. The project consisted of many sustainable services; rainwater harvesting, ammonia chiller, solar panels, sedum [...]

2021-01-06T15:15:36+00:00January 5th, 2021|

2014

Works commenced on two of our most prestigious projects to date. Both Grade I Listed private residences on the famous Kensington Palace Gardens in London. Priory carried out the £1.8Million and £1.9Million Mechanical & Public Health packages for Bouygues UK  which consisted of four phases over three years. See the our case study here on [...]

2021-01-10T14:38:46+00:00November 17th, 2020|

2013

It was Priory's 40th Anniversary in June 2013 and we had a number of exciting events to celebrate this memorable achievement. One of which being our trip to Lingfield Races in June of this year. It was a great opportunity to celebrate the longevity of Priory Mechanical and to highlight some members of staff that [...]

2020-11-17T15:02:31+00:00November 17th, 2020|

2013

Priory were awarded the design and build contract at The Serpentine Gallery, London for a renovation of the the Grade II listed building into public use for the first time in its 208-year history. The Serpentine Gallery restored the building to an excellent standard, in partnership with The Royal Parks, renovating and extending it to [...]

2020-11-17T14:51:23+00:00November 17th, 2020|

2012

Paul Molyneaux and Peter Sponder were appointed as directors in July 2012. Paul as Projects Director overseeing the running of all Priory's contracts and Peter as Technical Director overseeing the design part of the business.

2021-01-06T15:20:43+00:00November 17th, 2020|

2011

Sam Kennedy was appointed to the position of Commercial Director in October 2011 and now oversees the financial and commercial functions of the business.

2020-11-17T10:31:43+00:00November 17th, 2020|

2010

Priory secured a £2.5 Million design and build contract for a 180-bedroom hotel. The epic H10 Waterloo has an unbeatable central London location on the famous Waterloo Road in South Bank. Our design and build contract comprised of a full Daikin VRV Climate Control system throughout with large commercial mechanical plant across two plant rooms.

2021-01-06T15:19:48+00:00November 17th, 2020|
Go to Top